Longspan Shelving in in Castle Donington
A sound specification starts with the building and operation: dimensions, loads, staff and vehicle routes, services, fire strategy, current stock or workplace use, and realistic future demand. Mowbray can then compare the practical options and coordinate design, supply and installation around the live site.

Longspan shelving for Castle Donington manual-pick operations
Castle Donington is a natural location for longspan shelving because the area is shaped by national distribution activity. East Midlands Airport, the M1, A50 and A42/M42 place local warehouses within a dense road-and-air freight network, while SEGRO Logistics Park East Midlands Gateway adds a strategic rail freight interchange and large-scale logistics accommodation.In this setting, usable capacity matters more than a theoretical maximum. A layout must support inbound peaks, replenishment, picking, marshalling and despatch without making forklifts travel farther or forcing pedestrians into vehicle routes. The design should be tested against real pallet, SKU and throughput data.
Large modern units can offer generous clear height, but operational constraints still govern the result. Dock doors, yard flow, sprinkler clearances, battery-charging areas, roof haunches and column grids may dictate where storage equipment, platforms or internal work zones can sit. For airport- and logistics-linked occupiers, programme is often equally important. Installation phasing, delivery slots, exclusion zones and temporary storage need to be agreed before work starts so the project improves capacity without undermining service levels.

Where this solution is most useful
A practical feasibility study should model the busiest realistic operating period, not an average quiet week. Around Castle Donington, where road, airport and rail-linked logistics can create sharp inbound and outbound peaks, the design needs enough capacity and aisle resilience to work when stock and vehicle activity are at their highest. During survey, record the dimensions and constraints that affect this specific service, then agree measurable success criteria before product selection. That might include usable storage positions, clear aisle width, acoustic privacy, occupied floor area, loading capacity, fire performance, programme or a defined handover standard. The solution may also need to work with existing equipment or retained finishes. Identifying what can remain, what should be altered and what has reached the end of its safe or useful life prevents the budget from being consumed by avoidable replacement. It also helps the programme distinguish enabling work from the main installation.Key design and specification decisions
Shelf span and loadBay width, shelf depth and deck material determine shelf capacity. The design should use real maximum loads, not an average that ignores occasional heavy products.

Frequently picked goods should be kept between comfortable knee and shoulder height where practicable. Heavy or awkward items may need shorter spans, lower levels or handling aids.
Deck selection
Chipboard, steel or mesh decks suit different fire, cleaning, moisture and product requirements. Sprinkler strategy may restrict solid shelf arrangements. Where the building remains operational, installation logistics need to account for vehicle movements, protected pedestrian routes and safe temporary storage throughout the work.
Aisle and picking equipment
Aisles must accommodate people, trolleys, steps and replenishment safely. Narrowing every aisle can reduce productivity and create congestion.
Expansion and mezzanine use
Longspan can be extended, re-levelled or installed on a mezzanine when loads and routes are coordinated. Multi-tier systems require additional structural and fire design. A coordinated proposal gives the business a clearer basis for comparing investment in its current premises with the cost and disruption of relocation elsewhere in the district.

Survey, design and installation process
A controlled project starts with a brief that records the business problem, the proposed use, capacity, constraints, target dates and who can approve decisions. Mowbray can then survey the property and develop options around the relevant structure, equipment, partitions, storage and finishes. The survey should be sufficiently detailed for the stage of the project and should identify information that still needs specialist verification. Concept layouts are most useful when they compare outcomes. For storage work, that may include usable locations, selectivity, aisle requirements and handling method. For office or partitioning work, it may include occupancy, room mix, acoustic performance, daylight, circulation and service changes. A budget should state its assumptions, exclusions and risk allowances so that later quotations can be compared on the same basis. After the preferred option is selected, structural calculations, product specifications, service coordination, fire information, landlord requirements and statutory submissions can be completed as applicable. Installation planning should then cover deliveries, access, lifting, waste, noisy work, temporary routes, segregation and the point at which each area is safe to release for use.
After the preferred option is selected, structural calculations, product specifications, service coordination, fire information, landlord requirements and statutory submissions can be completed as applicable. Installation planning should then cover deliveries, access, lifting, waste, noisy work, temporary routes, segregation and the point at which each area is safe to release for use.
Measure products, weights and pick frequency - Agreed project brief and success measures
Survey the space and manual routes - Verified site information and constraints
Develop bay and aisle layouts - Comparable layout and budget options
Select decks and accessories - Coordinated construction information and approvals
Install, anchor, label and inspect - Controlled installation with recorded checks
Adjust shelf levels after controlled operational review - Handover information for safe operation and maintenance
Key design and specification decisions
Shelf span and load - Bay width, shelf depth and deck material determine shelf capacity. The design should use real maximum loads, not an average that ignores occasional heavy products.
Manual handling - Frequently picked goods should be kept between comfortable knee and shoulder height where practicable. Heavy or awkward items may need shorter spans, lower levels or handling aids.
Deck selection - Chipboard, steel or mesh decks suit different fire, cleaning, moisture and product requirements. Sprinkler strategy may restrict solid shelf arrangements.
Aisle and picking equipment - Aisles must accommodate people, trolleys, steps and replenishment safely. Narrowing every aisle can reduce productivity and create congestion.
Expansion and mezzanine use - Longspan can be extended, re-levelled or installed on a mezzanine when loads and routes are coordinated. Multi-tier systems require additional structural and fire design.
Coordinating the complete space
The project may need to integrate parts bins and shelf dividers; packing benches and workstations; mezzanine floors and multi-level picking; secure mesh partitioning; and pallet racking for reserve or bulk stock. Treating these as connected packages reduces clashes and makes responsibility clearer. For example, a partition can affect ceiling support, ventilation and fire detection; racking can affect lighting and sprinkler clearances; a mezzanine can change routes, loads and services both above and below the new deck. Coordination is also commercial. One option may have a lower equipment price but create more building work, operational downtime or future handling cost. A second option may require greater initial investment but provide more capacity, better access or easier alteration. The decision should consider total operational value, not only the headline supply price.
Compliance, safety and approvals
The shelving must be assembled, anchored where required and loaded within its declared limits. Manual-handling assessment should consider item weight, reach, repetition and use of access equipment. Damaged beams, frames or decks should be reported and assessed. Fire routes and sprinkler clearances must be maintained, and shelf materials should be compatible with the building’s fire strategy. The exact approval route depends on the building, the work and the intended use. Building Regulations, planning, landlord consent, fire-risk information, accessibility, asbestos records, structural verification and insurer requirements are separate matters and should not be assumed to be covered by one approval. Where construction work is involved, client, designer and contractor duties under the Construction (Design and Management) Regulations 2015 should be allocated and managed.
After handover, the occupier should retain drawings and load or performance information, train users where needed and report defects promptly. In Castle Donington, as elsewhere, later alterations should be checked against the original design rather than treated as routine maintenance.
What affects cost and programme?
There is no responsible fixed price for longspan shelving in Castle Donington without a survey and agreed specification. Cost changes with size, loading or performance, access, fire and service work, installation phasing and the amount of making good. Quotations should therefore be compared on a like-for-like written scope, not on a headline figure alone.
Bay width, height and depth - Changes the quantity, capacity or structural specification.
Number and load rating of shelf levels - Affects engineering, component selection and installation time.
Chipboard, steel or mesh decks - Can add specialist products, coordination or testing.
Dividers, bins and accessories - May require approvals, protection or altered sequencing.
Mezzanine or multi-tier installation - Influences access, labour and disruption to the live site.
Stock relocation and site access - Should be defined before quotations are compared like for like.
Programme follows the same logic. Standard components and clear access can shorten delivery, while structural checks, specialist finishes, approvals, service alterations or work around live operations add time. Key decisions should be frozen before manufacture or site mobilisation. For budgeting, the proposal should identify what is designed, supplied, installed, tested and handed over, together with exclusions and assumptions. That makes change control clearer and reduces the risk of comparing a complete project with a supply-only price. Where the project crosses several operational packages, storage equipment, mezzanine structure, partitions, lighting and staff routes should be coordinated on one plan so that one improvement does not block another.
Why work with Mowbray?
Mowbray's published service range covers mezzanine floors, racking, shelving, partitioning and office refurbishment. That breadth suits Castle Donington projects where production, warehousing, engineering and office functions can share the same building and need coordinated access, services and phasing. The most useful enquiry includes drawings or photographs where available, approximate dimensions, stock or team information, known loads or performance requirements, access constraints and the desired programme. A site survey can then verify the details that materially affect design and price.
To discuss longspan shelving in Castle Donington, call Mowbray on 01572 827206, the Northern Office on 0113 403 1160, or email info@mowbrayltd.co.uk. The recommendation should be based on the actual premises and operating brief, not a generic location-page specification.
FAQs
- How much weight can longspan shelving hold?
Capacity varies by manufacturer, bay width, shelf depth and deck. The supplier should provide the safe load for each shelf and bay in the final configuration.
- Is longspan shelving the same as pallet racking?
No. Longspan is generally for manually picked goods, while pallet racking supports palletised loads handled by lift trucks. The structures and operating risks are different. Related Mowbray guidance is available through shelving solutions.
- Can shelf heights be changed?
Most systems have adjustable levels, but the total bay load and component rules still apply. Adding extra shelves or moving beams should follow the manufacturer’s instructions. Related Mowbray guidance is available through storage solutions.
- Can longspan shelving go on a mezzanine?
Yes, when the mezzanine is designed for the combined shelving and stock loads. The layout, stairs, escape routes and picking method should be planned together. Related Mowbray guidance is available through industrial shelving.
- Is mesh decking better than chipboard?
Neither is universally better. Mesh can support sprinkler penetration and visibility, while chipboard provides a continuous surface. Product, fire, cleaning and load requirements decide the choice. Related Mowbray guidance is available through pallet racking solutions.
- Can Mowbray create a full picking area?
Mowbray can integrate longspan shelving with mezzanines, packing areas, partitions, pallet racking and other storage to create a complete operational zone. Related Mowbray guidance is available through instant quote calculator.